Home / Products / Industrial X-ray & NDT

Rooms that ship.
Cabinets that last.

Lead-and-steel inspection cabinets, modular X-ray rooms with the power and lighting already in them, and 200 to 400 KV NDT rooms fabricated and tested in Gibsonton, then assembled at your plant by the people who built them.

  • Uni-strut cabinets
  • Modular rooms
  • 200 to 400 KV
  • Tested before shipping
A modular industrial X-ray room
Modular X-ray room · fabricated, tested, shipped, re-assembled

X-ray inspection cabinets

Our cabinets are usually made of lead sandwiched between steel panels over a Uni-strut frame. They can be built with a simple single door that is manually operated, or with air or motor-operated multiple doors for production use. Size is dictated by the part and the target-to-film distance. Shielding is determined by the energy level of the equipment, and every unit is designed to conform to NRC codes.

Inspection cabinet · single manual door
Inspection cabinet · single manual door
Production cabinet · multiple doors
Production cabinet · multiple doors
L-shaped enclosure · doors closed
L-shaped enclosure · doors closed

Modular X-ray rooms

Modular rooms and enclosures let you test large parts that personnel and machinery can walk or drive into. The modular design allows relocation within the plant or to a new one. Rooms are usually supplied with all necessary lighting and power outlets, with a load center incorporated for the specific X-ray unit. Every room is set up and tested at our plant before it ships from Gibsonton, so it meets the requirement before it meets your floor.

Most NDT requirements are unique to the user, so there are few units we can offer as standard. That is fine with us. Our background in the field lets us interpret what you need and apply it to what you have.

Modular room · assembled and tested in Gibsonton
Modular room · assembled and tested in Gibsonton
200 KV room · front elevation
200 KV room · front elevation
200 KV room · door open
200 KV room · door open
Aerospace facility · Cape Canaveral, FL
Aerospace facility · Cape Canaveral, FL
Modular room · New Hampshire
Modular room · New Hampshire
Enclosure · interior
Enclosure · interior

Site assembly, by our crew

Rooms are fabricated at our facility, then disassembled, shipped to your location, re-assembled, and tested on site by A-fabco personnel. The dual 200 KV and 400 KV industrial NDT complex in West Palm Beach, Florida is one of the larger projects we have completed, and it went together exactly this way.

Both rooms standing · 200 KV and 400 KV, West Palm Beach
Both rooms standing · 200 KV and 400 KV, West Palm Beach
Personnel door · 200 KV room
Personnel door · 200 KV room
Panel-by-panel assembly · aerospace plant
Panel-by-panel assembly · aerospace plant
Panels going up
Panels going up
Crew on site
Crew on site
Nearly closed in
Nearly closed in

Tell us the part and the energy.

Part size, target-to-film distance, kV, and where the room needs to live. We take it from there.